115 Delancey Street

115 Delancey Street, New York, NY 10002

Scope of Work:

  • 44 x (Drilled soldier piles with 24” casing and HP14x89 beam x 35Ft)
  • 53 x (Driven soldier piles with HP14x89 beam x 40Ft)
  • Timber lagging 14,750SF
  • 13 x (Drilled 13 3/8” soldier piles x 160Ft)
  • 600LF of 24” soil mix wall x 45Ft
  • Concrete buttons at MTA Structure
  • Braking out existing foundations
  • Waler, Heelblock and Raker system
  • Pipe bracing and walers at soil mix wall
  • 48 x(R51 hollow bar x 60Ft – 70Ft)
  • Excavation of soil 58,400CY of soil
  • Breaking out of 1265CY of existing concrete foundation
  • 271 x (16” open ended piles x 75Ft)
  • 65 x (13 3/8” drilled piles to rock x 175Ft)
  • 147 x (20” tapered steel pile x 80Ft)

Commencement date:
August 2015

Completion date:
April 2016

Owner:
Delancey Street Associates LLC
111 Eight Avenue
New York, NY
10011

Architect:
Handel Architects LLP
120 Broadway
New York, NY
10271

Structural Engineer:
WSP Cantor Seinuk
228 E 45th Street
New York, NY
10017

Construction Manager:
L & M Development Partners
1865 Palmer Avenue
Larchmont
NY 10538

Geotech Engineer:
URS
1255 Broad Street,
Clinton, NJ
07013

Project Size:
42,000Sqft