Clarkson Square
Location
New York, NY
Client
ECDNY
Luxury & Community Living in West Village
A new landmark where elegance, accessibility, and community come together in one of New York City’s most covered residential districts.
The Clarkson Square development is a transformative full-block destination in the West Village of Manhattan, blending ultra-luxury residences, senior-affordable housing, and vibrant ground-floor retail. The development features two distinctive towers: 80 Clark Street roses 34 stories and 419 feet, offering 679,000 square feet with 133 ultra-luxurious residential units, while 570 Washington Street stands 19 stories with approximately 170,000 square feet, combining retail space with 169 affordable senior rental units.
Scope of Work
- Supply and install site fence
- 40 x (9 5/8″ x 35Ft drilled soldier piles with 10′ toe into bedrock)
- Underpinning to rock
- 4,200SF Timber Lagging
- 80 x (R51 Hollow Bars drilled between 20Ft – 40Ft into rock)
- Waler and Tieback system
- Excavation and disposal of 7,875CY of Soil
- Excavation and disposal of 21,000CY of Rock
- 38,000LF of Line Drilling of rock
- 40′ Deep Excavation
- Grace Preprufe Waterproofing
- 11,100 Sqft Foundation
- 2 Levels of structural slabs
Luxury & Community Living in West Village
A new landmark where elegance, accessibility, and community come together in one of New York City’s most coveted residential districts.
The Clarkson Square development is a transformative full-block destination in the West Village of Manhattan, blending ultra-luxury residences, senior-affordable housing, and vibrant ground-floor retail. The development features two distinctive towers: 80 Clarkson Street rises 34 stories and 419 feet, offering 679,000 square feet with 133 ultra-luxurious residential units, while 570 Washington Street stands 19 stories with approximately 170,000 square feet, combining retail space with 169 affordable senior rental units.
Scope of Work
- Supply and install site fence
- 40 x (9 5/8” x 35Ft drilled soldier piles with 10′ toe into bedrock)
- Underpinning to rock
- 4,200SF Timber Lagging
- 80 x (R51 Hollow Bars drilled between 20Ft – 40Ft into rock)
- Waler and Tieback system
- Excavation and disposal of 7,875CY of Soil
- Excavation and disposal of 21,000CY of Rock
- 38,000LF of Line Drilling of rock
- 40’ Deep Excavation
- Grace Preprufe Waterproofing
- 11,100 Sqft Foundation
- 2 Levels of structural slabs




