Smith Street Waterfront

Waterfront

Smith Street Waterfront

The site is located along the Gowanus Canal and had an old bulkhead that was in disrepair. The objective of the project at this Superfund site was to implement the IRM work plan by the project Geotechnical Engineer to replace the existing bulkhead and install a cut off wall to stop contaminant migration off site.

Scope of Work – Platform