Willets Point
Location
Willets Point, NY
Owner
Related Companies
Client
Related Companies
Building Foundations
Willets Point Platform and Buildings
The next phase of transformation in Willets Point is the result of historic public-private investment to turn the area into a true mixed-use, mixed income neighborhood—turning the tide on decades of neglect to bring the community long-term economic opportunity.
In November 2022, Mayor Adams announced a vision for Willets Point that is anchored by 2,500 new affordable homes, the largest 100-percent affordable, new construction housing project in New York City in 40 years. The plan will also bring New York City’s first soccer-specific stadium along with public open space, a hotel and neighborhood-serving, ground-floor retail shops that will create good-paying jobs for community residents. All told, the project is expected to create over 16,000 jobs as well as generate $6.1 billion in economic impact over the next 30 years.
Scope of Work – Platform
- Design and Build the concrete platform to carry the infrastructure and roadways throughout the site within strict tolerances required for settlement
- Installation of 2,500LF of 30-in diameter Soil Mix Wall
- Installation of 1043x – 16-in diameter Full Displacement Piles (FDP)
- Installation of 152x – 16-in diameter Retaining wall Full Displacement Piles (FDP)
- Installation of 33x micropiles alongside Roosevelt Ave Bridge
- Excavation and disposal of 35,000 Ton of soil
- Form, pour and strip pile caps, retaining walls and deck for platform – 11,800CY
Scope of Work – Building 1 & 2
- Redesign and value engineering of the piles and concrete work
- Installation of 1063 x 16” Full Displacement Piles (FDP)
- Excavation and disposal of 30,000 Ton of soil
- Furnish and installation of GCP waterproofing system
- Furnish and installation of rebar and concrete for foundation – 12,000CY
- Furnish and installation of rebar and concrete for Superstructure – 12,000CY